Skip to content
Design retainers started over the winter are first in line for spring builds. Ask about the next opening.
Monday – Friday: 8 a.m. – 5 p.m.Residential General Contractor · OR CCB # 000000VerifyLead-Safe Certified Firm (RRP) · US Certificate 000000General liability and workers' compensation
2 more licenses
  • Residential General Contractor · OR CCB # 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Certificate 000000
  • General liability and workers' compensation
(541) 555-0103

Design-build · Bend, Oregon

Draw it first. Then decide if we build it.

A design retainer pays for the drawings, the scope and a written build price. Only then do you choose whether to sign a build agreement with us. We work on renovations and additions in Bend and the neighborhoods around it.

  • Phase one: a design retainer
  • Phase two: a build agreement
Charcoal board-and-batten house with warm lit windows and a glass door, set against a forest slope at dusk

How we work

Two agreements, not one

You sign the second only when you have seen what the first produced.

Hands marking a plan with an architect's scale ruler on a dark wood table
Phase one ends with a number you are free to say no to.
Phase one · Design retainer

We draw it, scope it and price it

The retainer pays for design on its own terms. You get measured drawings, a materials and fixtures list, the design-review package if your neighborhood asks for one, and a written build price for the whole job.

  • Site visit and measured drawings

  • Two or three layout options, then one full drawing set

  • Windows, tile, cabinets and lighting chosen on paper

  • A build price itemized by part of the house

Open timber framing of a new structure with posts, beams and rafters among trees
Phase two begins only when you sign it.
Phase two · Build agreement

We build what the drawings show

If you hire us, the retainer is credited toward the build and the drawings become the contract set. The project manager and lead carpenter who read them with you run the site.

  • Permits pulled before any work begins

  • A week-one plan: who is on site, what is covered, what is shut off

  • A weekly note on what was done and what comes next

  • Changes priced in writing before they are built

What we take on

Work that needs a design phase

We take projects where the layout, the structure or the way the house meets its lot is part of the question. A single repair or a cabinet swap is better served by a handyman or a specialty trade.

  • Whole-house renovations

    A 1990s plan on a view lot, or an Old Bend bungalow that closes every room off.

    See the work
  • Additions and second stories

    A bedroom wing, a studio over the garage, a floor that wasn't there.

    See the work
  • Kitchens and great rooms

    The room people end up in, redrawn around how you cook and gather.

    See the work
  • Primary suites and baths

    Bedroom, closet and bath planned as one suite, not three rooms.

    See the work
  • Outdoor living

    Covered patios, decks and kitchens for a short, dry, bright season.

    See the work
  • Exteriors and fire-wise details

    Roofs, siding, windows and vents chosen for snow, sun and embers.

    See the work

Finished work

Rooms we have drawn and built

The scope is in each caption, so you can see what a project asked for.

Open kitchen with a gray island, woven pendant lights and a concrete floor
Kitchen and great room: wall removed, island added, floor replaced
Primary bathroom with a marble vanity top, glass shower and patterned floor tile
Primary bath: new layout, steam-ready shower, heated floor
Close view of oak herringbone flooring
Whole-house floors: white oak in herringbone, stained to match
Screened porch with a vaulted wood ceiling, skylight and a wicker sofa
Screened porch: framed, vaulted and finished in cedar
Backyard A-frame cabin beside a cedar-shingle house under tall trees
Guest cabin: designed to sit between the existing trees
Kitchen with white cabinets, a dark island, stools and a stone backsplash
Kitchen: cabinets refaced to the drawings, stone to the ceiling

Sample photos.

The studio

Who you meet in phase one

The people who draw your project are the ones who build it.

  • Sachiko Nakama

    Principal and design director

    Draws the first concept for every project herself and stays on it through the drawing set.

  • Woodrow Pettiford

    Principal and builder

    Reads each drawing set for how it will be built before anyone prices it.

  • Lluvia Villalobos

    Senior designer

    Runs selections and design review, and keeps the drawings current as choices are made.

  • Ajay Chokshi

    Project manager

    Writes the build price and the week-one plan, then runs the schedule on site.

  • Teodora Juric

    Lead carpenter

    Leads the carpenters who frame, trim and finish, and walks each room at the end of the first week.

Neighborhoods

Bend's west side, its old core and the resorts

Each part of town asks something different of a project: design review, lot setbacks, snow load, defensible space. We have worked through all of them.

Small white cottage with a covered porch and Adirondack chairs on a lawn

Bend, west side

  • Awbrey Butte
  • Awbrey Glen
  • Northwest Crossing
  • Tetherow
  • Broken Top
  • Summit West

Bend, central and east

  • Old Bend
  • Orchard District
  • Mountain View
  • Century West
  • Southern Crossing
  • Deschutes River Woods

Resort and ranch communities

  • Eagle Crest
  • Black Butte Ranch
  • Brasada Ranch
  • Crooked River Ranch

We don't take projects outside Central Oregon, or commercial work.

After phase one

What clients wrote after the drawings

“We had just moved from Seattle and didn't know what the house could be. The drawings showed two layouts and what each would involve, and we chose before anyone mentioned a build price.”

Mona H.Northwest Crossing, kitchen and great room

“I read the build price against the drawings and could see where every line came from. We said yes to phase two a week later.”

Dmitry L.Awbrey Butte, whole-house renovation

“When the price came in above what we wanted, they redrew the bath instead of arguing for it. That is what the retainer was for.”

Liya C.Old Bend, primary suite

Sample reviews.

Before you call

Questions about the two phases

What does the design retainer cover?

Measuring the house, the layout options, the full drawing set, your selections and the written build price. It is its own agreement, with its own scope and fee, signed before any drawing begins.

Do I have to build with you after phase one?

No. The build agreement is separate, and you decide when you have the drawings and the price in hand. Whether the drawings go to another builder is set out in your retainer agreement.

Does the retainer come off the build price?

If you hire us for phase two, the retainer is credited toward the build. The terms are written in the retainer agreement, not promised on this page.

Can you build through a Bend winter?

Interior work runs all year. Foundations, concrete and the exterior envelope follow the weather, so we plan them for the dry months and tell you which phase lands where.

What about neighborhood design review?

Several west-side communities ask for a design-review submission before a permit. We prepare it as part of phase one.

My house was built before 1978. Does that change anything?

Yes. Paid renovation in a home built before 1978 falls under the EPA's lead rule for renovation, repair and painting. The firm must be EPA-certified and use lead-safe work practices when work disturbs painted surfaces. Small repairs under 6 square feet inside or 20 square feet outside are exempt, but window replacement and demolition never are. We test or assume lead before we plan the work, and we show you how the work area will be sealed.

Start here

Tell us about the house

We write back about a time to talk. A first conversation commits neither of us to anything.

Hours
Monday – FridayToday
8 a.m. – 5 p.m.
SaturdayToday
By appointment
SundayToday
Closed

The house

You

When would you like to start?

We reply within two working days about a time to talk.