Pricing

How a two-phase project is priced

No figures on this page, because the house sets them. A written price comes at the end of phase one, built from your drawings.

  • What decides the price

    In design-build the price follows the house and the choices in it, not a square-foot rate. Cost guides disagree widely, because a kitchen can be a cabinet swap or a gutted room, so we don't print an average.

    • Whether walls, plumbing or the roofline move

    • The age of the house and what is behind the walls

    • Materials and finish level, room by room

    • Site access, slope and season

    • Permits, design review and engineering

  • What the design fee covers

    The design retainer pays for phase one: measuring, layout options, the drawing set, selections, design review and the written build price. It is its own agreement. The amount is set by the size and complexity of the project, written in the retainer agreement and credited toward the build if you hire us.

    • The amount and what you receive are written before drawing begins

    • Billed as the drawings progress

  • What the estimate includes, and what it doesn't

    The written build price is itemized by part of the house, with the allowances we have set and what we have left out.

    • Included: framing, trades, finishes, permits for work we contract, protection and cleanup

    • Not included: furniture, appliances you buy yourself, items you haven't chosen (an allowance stands in) and surveys or engineering stamps unless listed

  • How and when you pay

    Payments follow the written build agreement and Oregon law: a deposit at signing, then payments tied to stages of the work. You see the schedule before you sign.

    • Nothing is due ahead of the work it pays for

    • The final payment follows the walk-through list

  • If the job changes

    A change to the work is priced in writing, with its effect on the schedule, before it is built. You approve each one.

    • Changes are signed before work starts

    • Hidden conditions are reported the day they are found

  • Materials and who buys them

    You choose materials in phase one, and we order them. Items not yet chosen carry an allowance in the price, and the difference is adjusted in writing once you decide.

    • Lead times are written into the schedule

    • Allowances are listed by item

We don't arrange financing. If you plan to borrow, ask your lender about renovation loans during phase one; we will give them the written price.

Why no average

Why we don't print a price per square foot

The same floor area can be a kitchen with the walls in place or a kitchen with the roof off. A number printed before the drawing exists would be about a different house than yours.

The retainer is how we avoid that. It buys the drawings and the price together, so the first number you see is about your house, and you can change the house until the number suits you.

Ask what phase one would cost for your house.

We give you the retainer's scope and amount in writing after the first conversation, before you sign anything.