How we work

Two phases, and a decision between them

Phase one is a design retainer. Phase two is a build agreement. Between them is a decision that is yours alone, made with the drawings and a written price in front of you.

Most renovation trouble starts when a builder prices a project that hasn't been drawn. We draw first, so the number at the end of phase one is built from decisions instead of guesses.

  • The retainer is its own agreement, with its own scope

  • The build agreement is signed only if you choose it

  • The retainer is credited toward the build if you hire us

Rolled plans with an architect's scale ruler on a workbench

Phase one

The design retainer

Five steps, from a first conversation to a written price.

  1. 01

    Step 1: A first conversation

    On the phone or in the studio. We ask about the house and how you live in it; you ask about us. Nothing is signed.

  2. 02

    Step 2: Retainer agreement

    We write down the scope, the fee and the schedule for phase one. You sign it, and drawing begins.

  3. 03

    Step 3: Walk, measure and options

    We measure the house and show you two or three layouts, each with what it would involve.

  4. 04

    Step 4: Drawings and selections

    One layout is drawn in full. You choose windows, tile, cabinets, fixtures and lighting, and we prepare the design-review package if your neighborhood needs one.

  5. 05

    Step 5: Written build price

    An itemized price for the whole job, with allowances for anything still open, and a proposed schedule.

The decision

What you can do at the end of phase one

  • Sign the build agreement

    The retainer is credited toward the build, and the drawings become the contract set.

  • Change something first

    If the price is above what you want, we redraw. Changing the drawings is what phase one is for.

  • Wait, or build elsewhere

    The retainer agreement says what you take with you. There is no pressure either way.

Phase two

The build agreement

Five steps, from permits to a walk-through list we finish together.

  1. 01

    Step 1: Permits and orders

    We pull the permits for the work we contract and order long-lead items, such as windows and cabinets.

  2. 02

    Step 2: Week one

    The project manager walks the house with you, and the crew protects what stays. The week-one plan says who is on site, what is covered and what is shut off.

  3. 03

    Step 3: The build

    A weekly note says what was done and what is next. Your project manager is a call or a text away.

  4. 04

    Step 4: Changes, in writing

    Anything outside the drawings is priced in writing, with its effect on the schedule, before it is built.

  5. 05

    Step 5: Walk-through and handover

    You and the lead carpenter walk each room with a list. We finish the list, then hand over drawings, product information and warranty terms.

Week one

What happens on the first week

Living in a house during work is easier when you know what to expect.

  • Who is on site

    The lead carpenter, the project manager and a small crew. You get their names and numbers before the first day.

  • What is covered

    Floors, stairs and furniture that stay are covered, and the work area is sealed from the rest of the house.

  • What is shut off

    We say which water, power and heat will be off, when, and for how long.

  • Where things go

    The dumpster, the tool storage and the daily parking are agreed beforehand, so the street and the neighbors aren't a surprise.

The Central Oregon year

When each part usually happens

A typical year. Your lot and your project will set their own.

  • Design retainers

    Winter is when we draw.

    Nov-Mar

  • Permits and long-lead orders

    Started as soon as you sign.

    Jan-May

  • Foundations, framing and exterior

    Tied to dry ground and dry weather.

    May-Oct

  • Outdoor rooms

    Finished for the long evenings.

    Jun-Sep

  • Interior finishing

    Runs behind the closed-in envelope.

    Sep-Apr

Start with the first conversation.

It's about the house and how you live in it. Nothing is signed and nothing is priced.