Skip to content
Design retainers started over the winter are first in line for spring builds. Ask about the next opening.
Monday – Friday: 8 a.m. – 5 p.m.Residential General Contractor · OR CCB # 000000VerifyLead-Safe Certified Firm (RRP) · US Certificate 000000General liability and workers' compensation
2 more licenses
  • Residential General Contractor · OR CCB # 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Certificate 000000
  • General liability and workers' compensation
(541) 555-0103

Services

A primary suite, planned as one room

Bedroom, closet and bath work best when they are drawn together: where the door swings, where the light falls at six in the morning, how far it is from the bed to the shower.

We draw the suite, detail the wet areas and choose tile, glass, fixtures and lighting before pricing. Not included: furniture, art and window coverings unless you ask for them.

What phase one includes

  • Layout options for the bedroom, closet and bath together

  • Shower, tub and vanity detailing, with waterproofing specified

  • Tile, glass, plumbing fixtures and lighting chosen on paper

  • Heated floors, ventilation and electrical planned in the drawings

  • A plan for using the rest of the house while the suite is out of service

Primary bathroom with a dark double vanity, glass shower and soaking tub by a window

Cost

What changes the cost

No figures here, because the house sets them. These are the parts that move the number.

  • Plumbing moves

    Moving the tub, shower or toilet means opening the floor below. Keeping fixtures where they are keeps the work simpler.

  • Shower and glass

    A curbless shower, a long glass panel or a steam unit each add structure, waterproofing and trade time.

  • Tile and stone

    Large-format slabs, patterned floors and niches change both material and labor.

  • Closet and cabinet work

    Built-in storage is priced by the run, in the same way as kitchen cabinets.

Phase one

How the design phase goes

  1. 01

    Step 1: Brief and measure

    We learn how the suite is used and measure it with the rooms around it.

  2. 02

    Step 2: Layout options

    Two or three plans, showing what moves and what stays.

  3. 03

    Step 3: Drawings and selections

    Wet-area details, tile layouts, fixtures and lighting, all specified.

  4. 04

    Step 4: Build price and decision

    A written price with allowances for what is still open.

Permits

Permits and approvals

Inside Bend's city limits, building permits go through the City of Bend; outside them, through Deschutes County. Bathroom work needs plumbing and electrical permits, and a new bathroom or a moved wall adds a building permit. We prepare these in phase one and pull them for the work we contract.

Examples

Examples of the work

Curbless walk-in shower with wood-look tile, a glass panel and a linear drain
Shower: curbless, wood-look porcelain, linear drain
Freestanding tub with a brass floor-mounted faucet beside a double-hung window
Tub: freestanding, floor-mounted filler, moved under the window
Walk-in glass shower with marble-look tile and brass fixtures
Shower: marble-look tile to the ceiling, brass fixtures

Sample photos.

Questions

Questions about this work

Can the shower be curbless?

Often, if the floor framing allows it to slope. Phase one checks the floor and tells you what a curbless shower would involve.

Can you add a bathroom?

Yes, where plumbing can reach and the permit office approves. The layout options show where it would go.

How long is the suite out of use?

The schedule says, week by week. We plan a temporary arrangement for the days it matters most.

Do you handle the glass and tile?

We coordinate both. The glass is measured after the tile is set, so it fits what is actually there.

Draw it first.

Book a first conversation about the house. We talk, then we look.